Steel installation
The canopy structure installed on the completed foundations.
Once the foundations are in, we install the steel canopy and the solar array on top. The solar PV system is installed and commissioned by our MCS-certified in-house team, then tested and handed over with full documentation.
A solar carport gets more out of a car park you already have. It generates electricity on site for your buildings, needs no roof space and shelters the vehicles and people underneath.
The steel canopy is installed on the completed foundations, then the solar panels are mounted on top and connected back to the site supply through the ducting laid during the groundworks. The solar installation is carried out and commissioned by our MCS-certified in-house team, working to a programme agreed around how your car park is used.
Because the electricity is generated where vehicles park, the system can feed battery storage and EV charge points as part of the same installation, depending on the scope of your project. Everything is tested and commissioned together before handover.
The canopy structure installed on the completed foundations.
Canopy-mounted arrays installed and commissioned by our MCS-certified in-house team.
Testing and commissioning of the completed system before handover, with documentation.
Foundations, groundworks, drainage and ducting complete.
Before installationThe canopy structure goes up.
InstallationThe array is mounted and connected.
InstallationStorage and charge points integrated, depending on scope.
Depending on scopeTesting and commissioning before handover.
HandoverShare your site plan, bay count and electricity bills. A UK engineer will model the right array for your car park.
Our MCS-certified in-house team installs and commissions every array.
Yes. Charge points can be integrated with the canopy array and the site supply, and with battery storage where project scope includes it.
Depending on the layout and scope, the works can be phased so parts of the car park stay in use. We agree the phasing with you before work starts.
The steel canopy is installed on the completed foundations as part of our single programme, so one contractor is responsible for the structure and the solar PV system on top.
We are an MCS-certified installer and NICEIC approved contractor, and our solar installers are part of our own in-house UK team.
The completed system is tested and commissioned before handover, with documentation.
Our Operations & Maintenance division can look after the structure, the array, the storage and the chargers.
Request a free feasibility study for a solar carport installed and commissioned by our own MCS-certified team.