Skip to content
MCS certified installer Coventry · Leeds · London

Workplace EV charging
for staff and fleets.

Charge points, load management and grid capacity planning for staff, visitor and fleet charging. Where possible we run them from your own solar, and our own OZEV-approved, NICEIC-certified electricians install them.

  • 7-22kW AC units, DC options for fleets
  • OZEVApproved installer
  • LoadManaged to your existing supply
  • SolarLinked charging where possible
Workplace chargingStaff and visitor bays
Fleet & depotOvernight and shift charging
Load managementAvoid grid reinforcement
Solar linkedCharge from your own roof
01. Who this page is for

Charge more vehicles
without an expensive grid upgrade.

Written for fleet managers, facilities teams and business owners who need to charge vehicles at work, from a handful of staff bays today to a whole depot later. The real question is rarely which charger to buy. It is how many vehicles you can charge, and when, without exceeding the supply you already have.

We start with your site supply, your vehicle numbers and duty cycles, and any solar or storage on site. Load management shares the available capacity across chargers, so a depot can charge overnight within its existing connection. Solar-linked charging sends daytime generation straight into your vehicles.

Our own electricians install and commission the charge points, we manage any grid application, and our operations and maintenance team keeps the chargers working afterwards. If you have a car park, a solar carport can generate the energy directly above the bays.

  • Workplaces
  • Fleets & depots
  • Commercial estates
  • Retail & leisure
  • Public sector sites
  • Car park operators
02. Solutions

Charging to suit
every site.

Workplace charging

AC charge points for staff and visitor bays with access control and simple back-office reporting.

Fleet & depot charging

Load-managed charging for vans, cars and light commercial fleets overnight or between shifts, with DC options where quick turnarounds need it.

Load management

Dynamic load management shares your available supply across chargers, so more vehicles charge without a costly connection upgrade.

03. Why Synergy Power

More than a charger installer.
An infrastructure partner.

01

OZEV approved

Installed by our own NICEIC-certified electricians under OZEV approval.

In-house electrical team
02

Designed to your supply

We assess capacity and design load management so the site stays within its connection.

Grid application managed where needed
03

Part of one system

We design chargers with the solar, storage and site supply as one system, not as an add-on.

Solar · storage · EV
04

Kept running

Monitoring, maintenance and fault response keep chargers working for the fleet that relies on them.

Operations & maintenance
04. How it works

From fleet plan
to first charge.

Step 01

Free feasibility study

We turn your vehicle numbers, duty cycles, site supply and bills into a charging design, estimated cost and indicative ROI.

No obligation
Step 02

Survey & design

Our engineers design the supply capacity, bay layout, cable routes and load management, and handle any grid application.

In-house engineers
Step 03

Proposal

Charger mix, phasing for fleet growth and finance routes, with solar and storage integration where it pays.

Phased for growth
Step 04

Installation

Our own electricians install the civils, cabling and charge points around your operations.

Around operations
Step 05

Commissioning & O&M

Testing, back-office set-up, monitoring and a maintenance plan.

Chargers kept available
06. Free feasibility study

Find out how many vehicles
your site could charge.

Share your vehicle numbers, site details and bills. A UK engineer will design the charging, check your supply and give you the figures.

  • Estimated system size
  • Estimated bill savings
  • Carbon reduction estimate
  • Indicative payback
07. EV infrastructure FAQs

Your EV charging
questions answered.

Still have a question?0330 043 1047
Do we need a bigger grid connection?

Often not. Dynamic load management shares your existing capacity across chargers so vehicles charge within your connection. Where an upgrade really is needed, we manage the application.

AC or DC chargers?

Most workplace and overnight fleet charging is AC at 7 kW or 22 kW. DC rapid charging suits fleets with short turnaround times. We recommend the right mix based on your duty cycles.

Can charging run from our solar?

Yes. Solar-linked charging sends daytime generation into your vehicles, and a battery can store it for the next shift.

Can we phase the installation?

Yes. We design the civils and cabling for the fleet you will have, and add chargers as vehicles arrive.

Who maintains the chargers?

Our operations and maintenance team monitors, maintains and repairs the charge points, so they stay available for the vehicles that rely on them.

Can you install without disrupting the site?

Yes. Our own electricians programme the civils, cabling and charge point installation around your operations and site access, and we can phase the work bay by bay.

Can visitors or the public use the chargers?

Yes. We set up the back office for access control, payment and reporting, so you decide who can charge and on what terms.

Are there grants for workplace charging?

Government support for workplace charging changes from time to time. We can advise on what may be available when we assess your site, but eligibility and amounts are set by the scheme, not by us.

Charge the fleet from your
own roof.

A free feasibility study from our UK engineering team: charging design, supply check, savings forecast and indicative ROI for your site.

Call now0330 043 1047 FreeGet a quote
Speak to us0330 043 1047 Message usWhatsApp