In April 2024 we completed a 200 kW commercial solar PV installation on the Grafton Building at Brooksby College, Melton Mowbray. The system uses 498 Jinko solar panels and two 100 kW Solis inverters, laid out to make the most of the available roof space.

  • 200kWSystem size
  • 498Jinko solar panels
  • 2 × 100kWSolis inverters
  • Apr 2024Installed
ClientBrooksby College
SectorPublic Sector · Education
LocationMelton Mowbray LE14 2LJ
System size200 kW
InstalledApril 2024
Delivered bySynergy Power
01 · System overview

Complex, large-scale solar
across the Grafton Building.

We designed and installed a 200 kW commercial solar PV system on the Grafton Building at Brooksby College, Melton Mowbray, maximising roof space and system efficiency across the building’s many roof sections.

The system combines 498 Jinko solar panels with two 100 kW Solis inverters, and was installed in April 2024.

02 · Solution delivered

Installation quality
you can see.

Precision installation, clean cable routing, and commercial-grade inverter systems highlight Synergy Power’s engineering excellence.

Installation quality

Precision installation

Panels laid out to make full use of the available roof space.

Clean cable routing

Neat, accessible containment from the roof to the inverter room.

Commercial-grade inverters

Two 100 kW Solis inverters sized for a system of this scale.

03 · System specification

What we installed
on the Grafton Building.

System size
200 kW
Panels
498 Jinko Solar panels
Inverters
2 × 100 kW Solis inverters
Installation type
Commercial rooftop solar PV
Location
Melton Mowbray LE14 2LJ
Installed
April 2024
04 · Results achieved

Estimated generation
and carbon reduction.

~180,000kWhEstimated annual generation
~40tEstimated CO₂ reduction per year
200kWInstalled system size
498panelsJinko Solar modules

The finished installation gives the college lower energy costs and a smaller carbon footprint, from a high-efficiency system design. Annual generation and CO₂ reduction are estimated figures.

Key benefits
  • Reduced energy costs
  • Lower carbon footprint
  • High efficiency system design
  • Trusted commercial installer
05 · Photos

From the roof
and the inverter room.

Conclusion

This project showcases Synergy Power’s capability to deliver complex large-scale commercial solar installations, maximising roof space and system efficiency.

Free Feasibility Study

Discuss a project
like this one.

Tell us about your site and a UK engineer will model the right mix of solar, storage and EV charging for you. No obligation.

  • Estimated system size
  • Estimated bill savings
  • Carbon reduction estimate
  • Indicative payback
Call now0330 043 1047 FreeGet a quote
Speak to us0330 043 1047 Message usWhatsApp