Integral Memory PLC.
Six years of solar, storage and EV.

A phased, multi-site programme across London NW10 and Calverton, Nottingham, combining solar PV, battery storage, EV charging infrastructure and electrical upgrades. Between 2020 and 2026 we delivered 416 solar panels, six Tesla Powerwall 3 systems and four commercial EV charging ports.

  • 6yrs2020 – 2026 programme
  • 2sitesLondon NW10 & Calverton
  • 416Solar PV panels
  • 6 + 4Powerwall 3 systems + EV ports
ClientIntegral Memory PLC
SectorCommercial · Manufacturing
LocationsLondon NW10 + Calverton
Programme2020 – 2026
ScopeSolar, storage, EV, electrical
Delivered bySynergy Power
01 · Client challenge

A technology manufacturer,
a continually evolving estate.

Integral Memory PLC is a technology manufacturer and distributor specialising in computer memory, flash storage and data storage solutions. With energy-intensive facilities and long operating hours, the company needed a long-term plan to reduce its exposure to rising electricity prices and to show clear progress on sustainability.

This was never a single installation but a continually evolving portfolio. Each site had its own roof layout, electrical infrastructure requirements, operational constraints and growth plans. Any solution had to scale across new units and phases without interrupting business on a working manufacturing estate.

02 · Solution delivered

A phased roadmap,
one accountable partner.

We developed a phased roadmap that began with commercial solar PV installations in 2020 and expanded into additional arrays, battery storage systems, EV charging infrastructure and electrical upgrades. Each phase was engineered to integrate with existing assets and leave room for future expansion.

The equipment evolved with the client’s needs: Sharp and Trina PV modules, SolarEdge optimised architecture and Solis string inverters on the early phases, Tesla Powerwall 3 storage from 2024 and Rolec commercial EV charging infrastructure from 2026, all commissioned and monitored under a single partnership.

Across the programme we designed for roof loading, electrical integration, inverter performance, battery integration, monitoring, operational continuity and long-term asset performance, with capacity left for expansion, so each new phase could tie in without undermining earlier work.

03 · System specification

Unit 15 (2020)

Panels
104 × Sharp 395 W
Inverter
33 kW SolarEdge optimised

Units 6 & 8 (2021)

Panels
48 × Trina 370 W per unit
Inverters
Dual Solis 7 kW string inverters per unit

Calverton & expansion (2024–2026)

Calverton panels
136 × Trina 425 W
Calverton inverter
50 kW SolarEdge
Battery storage
Tesla Powerwall 3 systems (6 across the programme)
EV charging
Rolec dual-port commercial stations (4 ports)
Electrical
Site electrification upgrades

Totals across the programme: 416 solar panels, 6 Tesla Powerwall 3 systems and 4 commercial EV charging ports.

04 · Installation programme

Six years,
five major phases.

Every phase was delivered through detailed surveys, structural assessments, electrical design, project planning, phased installation, commissioning and ongoing monitoring. Work was programmed to minimise disruption across a live manufacturing estate.

  1. 2020 · Unit 15

    Unit 15 solar array

    104 Sharp 395 W panels with a 33 kW SolarEdge optimised inverter.

    Phase 1
  2. 2021 · Unit 6

    Unit 6 solar array

    48 Trina 370 W panels with dual Solis 7 kW string inverters.

    Phase 2
  3. 2021 · Unit 8

    Unit 8 solar array

    48 Trina 370 W panels with dual Solis 7 kW string inverters.

    Phase 3
  4. 2024 · Expansion

    Additional capacity + Calverton

    Additional solar capacity, Tesla Powerwall 3 systems and a Calverton commercial solar install (136 Trina 425 W panels with a 50 kW SolarEdge inverter).

    Phase 4
  5. 2026 · Expansion

    Storage + EV infrastructure

    Additional Tesla Powerwall 3 batteries, Rolec dual-port commercial EV charging stations and site electrification upgrades.

    Phase 5
05 · Results achieved

Generation, savings and carbon
as recorded across the programme.

374k+kWh renewable electricity generated
£140k+Estimated electricity savings
80t+CO₂ emissions avoided
416panelsAcross two sites

The existing project record states that the monitored systems have generated more than 374,000 kWh of renewable electricity, delivered estimated savings exceeding £140,000 and avoided more than 80 tonnes of carbon emissions. Per-phase figures recorded for the early arrays are 232,000 kWh, £55,000 saved and 44 tonnes of CO₂ for Unit 15, and 71,000 kWh and £17,000 saved for each of Units 6 and 8.

The Powerwall 3 systems increase self-consumption of on-site solar, the Rolec EV infrastructure prepares the estate for fleet electrification, and ongoing monitoring gives the client evidence for sustainability reporting.

Generation, savings and carbon figures are reported for the programme to date.

06 · Photos

Across the estate.
Rooftops, storage, chargers.

Free Feasibility Study

Discuss a project
like this one.

Tell us about your site and a UK engineer will model the right mix of solar, storage and EV charging for you. No obligation.

  • Estimated system size
  • Estimated bill savings
  • Carbon reduction estimate
  • Indicative payback
Call now0330 043 1047 FreeGet a quote
Speak to us0330 043 1047 Message usWhatsApp