Public sector solar,
delivered within funding deadlines.

Feasibility studies, design, procurement support, installation, commissioning and ongoing maintenance for local authorities, education, healthcare and housing associations. One in-house team that understands funding windows, mobilises quickly and stays accountable for the asset long after handover.

  • End-to-endFeasibility to maintenance
  • FundedGrant-funded project experience
  • FastMobilisation inside funding windows
  • In-houseEngineering, roofing & O&M teams
Local AuthoritiesCivic estates, depots and car parks
EducationSchools, trusts, colleges and universities
HealthcareNHS trusts, surgeries and care estates
Housing AssociationsRetrofit across social housing stock
01. Decarbonisation proposition

Net Zero targets
and fixed spending deadlines.

This page is for estates managers, sustainability leads, heads of property and finance officers in the public sector. You have a decarbonisation target to hit, a funding window to spend within and a duty to evidence every step. Those three pressures shape everything we do on a public sector project.

We take projects from the first feasibility study to long-term maintenance. We produce the figures your funding application needs, design the system, support procurement with the documentation your route requires, install around the site’s working day, commission and hand over, then maintain the asset for its full life.

Because engineering, roofing and maintenance are all in-house, one contractor is accountable for the whole programme. That holds for a single school roof and for a multi-site solar carport and battery storage scheme delivered against a grant deadline.

  • Local authorities
  • Education
  • Healthcare
  • Housing associations
02. Who we support

Four parts of
the public sector.

Each has its own page, with the detail that matters to that estate.

03. The funding and deadline challenge

Why funded projects fail,
and how we stop it.

Public sector renewable projects rarely stall on engineering. They stall on time, evidence and capacity.

01

Fixed spend windows

Funding often arrives late in the year with a hard completion date. We plan every programme backwards from that date.

Funding deadline awareness
02

Applications need evidence

Competitive rounds expect credible system sizes, savings, carbon and cost figures. Our feasibility study provides exactly that.

Application-ready figures
03

Procurement takes time

Frameworks, compliant quotes and direct awards each need documentation. We supply it early so procurement doesn't eat into the window.

Procurement support
04

Capacity is the bottleneck

Funded programmes need dependable delivery. Our engineers, electricians and roofers are in-house, and we schedule them ourselves.

Fast mobilisation
04. Funding experience

Funding routes
we have worked with.

Programmes, criteria and deadlines change from year to year. These are the funding areas we have experience of supporting, and we confirm what is open to your organisation as part of every feasibility study.

DESNZ

Programmes led by the Department for Energy Security and Net Zero.

Great British Energy

The publicly owned energy company and its programmes for public estates.

Combined Authority & Mayoral Funds

Regional funds administered by combined and mayoral authorities.

Public Sector Decarbonisation Schemes

Capital schemes for decarbonising public buildings and estates.

Shared Prosperity Funding

Local growth and place-based funding routed through local authorities.

Community Energy Funding

Funding for community-led and community-benefit energy projects.

Regional Net Zero Programmes

Regional and local programmes delivering Net Zero action plans.

05. What we deliver

Six capabilities,
one accountable contractor.

Our own teams deliver every stage, so nothing is lost between contractors.

Feasibility studies

We turn site data and electricity bills into an estimated system size, savings forecast, carbon reduction estimate and indicative ROI, the figures an application and a business case need.

Design

Structural, roof and electrical surveys, system design across solar, storage, carports and EV charging, and the DNO application, which can take time.

Procurement support

Accreditation, insurance, health and safety and policy documentation for frameworks, compliant quotations and direct awards, supplied before tender.

Installation

RAMS-led delivery by our own engineers, electricians and roofers, sequenced around the working day, term dates or clinical activity.

Commissioning

Testing, MCS documentation, DNO confirmation, monitoring set-up and a handover pack ready for your asset register and funder return.

06. Fast mobilisation

Assess. Design. Fund.
Install. Commission. Maintain.

The six stages every public sector project follows, planned backwards from your deadline.

Step 01

Assess

Free feasibility study with application-ready figures.

No obligation
Step 02

Design

Surveys, system design and DNO application started early.

In-house engineers
Step 03

Funding & procurement support

Application evidence and the documentation your procurement route needs.

Deadline-planned
Step 04

Install

Our own crews on site, programmed around how the estate operates.

Fast mobilisation
Step 05

Commission

Testing, certificates, monitoring and a handover pack.

Funder-ready evidence
Step 06

Maintain

Monitoring, planned maintenance and fault response for the asset's life.

Long-term support
08. Free feasibility study

Discuss your
decarbonisation project.

Share your site list, deadline and electricity bills. A UK engineer will model the right mix of solar, storage, carports and EV charging and give you the figures your funding application needs.

  • Estimated system size
  • Estimated bill savings
  • Carbon reduction estimate
  • Indicative payback
09. Public sector FAQs

Public sector
questions answered.

Still have a question?0330 043 1047
Can you work through our procurement framework?

Yes. We provide the accreditation, insurance, health and safety and policy documentation your route requires, whether that is a framework call-off, a compliant quotation process or a direct award.

Do you help with funding applications?

Yes. Our feasibility study produces the system size, savings, carbon and cost figures an application needs, and we support the evidence and delivery programme behind it. Programmes change, so rather than promise what's available, we confirm what is open to your organisation.

What happens if the funding deadline is tight?

We plan the programme backwards from the deadline and run surveys, design, DNO applications and procurement documentation in parallel. If a date isn't realistic, we'll tell you early.

Can you install while the site stays open?

Yes. Our installations are RAMS-led and sequenced around the working day, term dates or clinical activity, with our staff inducted and checked as the site requires.

What do we receive at handover?

MCS certificates, electrical test certificates, DNO confirmation, as-built information, monitoring access and an operations and maintenance plan, ready for your asset register and funder return.

Do we need planning permission?

Many rooftop systems on non-domestic buildings can be installed under permitted development, subject to conditions. Listed buildings, conservation areas, ground-mounted systems and solar carports may need consent. We check at survey and prepare the drawings for any application.

Which accreditations do you hold?

We are MCS certified and NICEIC approved, members of RECC and TrustMark, and hold CHAS and Constructionline (Silver). Certificates, insurances and policies are supplied with your procurement documentation.

Decarbonise on
deadline.

A free feasibility study from our UK engineering team, with the figures your funding application and cabinet report need.